Pipeline Repair Completed

The City of Edinburgh has completed the repair to the main outflow from Harlaw Reservoir.  The pipe was leaking but now has a polymer lining; the repair was complex and took longer than expected but the end result is great success.  A full ‘valves open’ test was carried out in October.

Valve Closed

Valve Closed

Valve Open

Valve Open


Leave a Reply